ym168 发表于 2023-1-28 14:04

英特尔重申Meteor Lake将在今年下半年推出, 明年Lunar Lake投产

虽然英特尔强调2022年第四季度糟糕的财报主要是经济疲软所致,但CEO帕特-基尔辛格(Pat Gelsinger)在财报电话会议上也承认,英特尔正在不断失去数据中心市场份额。事实上,数据中心产品的不断延期困扰着英特尔,好消息是消费端的路线图仍按计划进行。

Meteor Lake是英特尔一个重要的里程碑,原因有两个:一是首款采用Intel 4工艺的处理器;另外一个是首次采用了模块化设计的处理器,会有四个不同的模块,分别是计算模块、SOC模块、I/O模块和GPU模块,可搭配不同制程节点的模块进行堆叠,再使用EMIB技术互联和Foveros封装技术。



英特尔表示Meteor Lake将会在今年下半年推出,不过没有确认Meteor Lake是否仅面向移动平台,还是会推出桌面平台的产品。此前有报道称,英特尔可能取消Meteor Lake的桌面版本,也就是采用LGA 1851插座的Meteor Lake-S。

传闻Lunar Lake将采用一种全新的CPU架构和全新的底层设计,主要专注于移动设备的每瓦性能改进。英特尔表示,Lunar Lake会在2024年流片(Tape Out),做好生产准备,针对超低功耗性能的优化可以让其PC合作伙伴为移动用户打造超薄及轻便的系统。

英特尔已经在1月10日推出了代号为Sapphire Rapids第四代至强可扩展处理器,接任者Emerald Rapids将在今年下半年到来,之后的Granite Rapids和Sierra Forest会在明年出现,后者是其首款采用高效核心的服务器处理器。

https://www.expreview.com/86591.html

darkblue 发表于 2023-1-28 14:31

如果忘记了之前的历史,以下信息供各位参考:
https://www.extremetech.com/computing/341788-intel-rumored-to-cancel-meteor-lake-desktop-cpus-in-favor-of-raptor-lake-refresh

英特尔在14纳米工艺上停滞不前多年,让AMD在这个过程中利用台积电的技术跨越了它。现在它可能再次遇到这个问题,试图从10纳米跳到7纳米。
换句话说,英特尔应该会在明年推出其首个基于瓦片的CPU,又称Meteor Lake。这是该公司的第一个分解的CPU,不同的瓦片建立在不同的工艺上。CPU瓦片应该是一个节点跳跃的结果,从英特尔7(10纳米)到英特尔4(7纳米)。这是该公司的一个分水岭产品,因为它从单片和混合设计过渡到瓦片。然而,尽管Meteor Lake已经被多次推迟,但现在传言它将被取消。至少,桌面部分被认为是被砍掉了。因此,它可能仍会在某个时候推出,但只针对移动设备。

Chipzilla的坏消息来自Twitter用户Raichu,一个可靠的机密信息泄露者,他说台式机的Meteor Lake "可能 "被取消,因为英特尔认为它没有竞争力。英特尔曾计划只提供六个性能核心,以及16个效率核心。这在之前英特尔计划的泄漏中有所阐述。你还记得,其目前的Raptor Lake旗舰产品有8个性能核心,和16个效率核心,所以Meteor Lake 将是一个退步。英特尔认为它没有竞争力可能是真的,也可能是真的再次推迟了。目前还不清楚所谓取消的具体原因。然而,正如我们之前指出的,它现在正计划在2023年进行Raptor Lake的更新。

上面泄露的2023年路线图并没有提到Meteor Lake。相反,英特尔将在精致的10纳米工艺上提供Raptor Lake的更新。这应该允许它从芯片中挤出几百兆赫兹,并提高一点效率。对英特尔粉丝来说,好消息是它将使用它目前提供的相同的LGA 1700插座。有传言说Meteor Lake将在Raptor Lake之后出现在一个新的LGA 1851插座上。这将使LGA 1700的CPU只有两代。现在看来将是三代。Alder Lake、Raptor Lake和Raptor Lake refresh 。

正如你所记得的,Raptor Lake的存在只是因为英特尔两年多前意识到Meteor Lake没有达到其开发目标。这一点得到了英特尔的证实,所以这不是道听途说。快进到2022年的现在,如果它仍然有问题,没有人会感到惊讶。我们写的每一篇关于Meteor Lake的文章几乎都涉及延迟。有传言说,由于延误,它正在取消台积电的3纳米GPU芯片。相反,它将使用该公司现有的5纳米节点。7月份也有报道说Meteor Lake被推迟到2023年底。如果你向上滚动并查看这些路线图,你可以看到Meteor Lake已经从2023年的时间表上消失了。

现在看来,英特尔认为Raptor Lake将比流星湖对AMD即将推出的产品更具竞争力。预计这将是更多的Zen 4 CPU和几个V-Cache SKU。另外,也许它目前基于瓦片的计划会比直接的马力更有利于提高效率。这将解释Meteor Lake是一个移动平台,而不是用于桌面。所以Arrow Lake将在桌面上接过衣钵。这将在2024年的某个时候发生在英特尔的20A工艺上。据称,Arrow Lake将恢复目前使用的8/16核心数。

据Wccftech报道,在10月份的财报电话会议上,首席执行官Pat Gelsinger发表了以下声明:"在英特尔4号上,我们正朝着大批量生产的方向发展,并将在第四季度在Meteor Lake进行生产步骤的录音。英特尔4号和3号是我们第一个部署EUV的节点,在每瓦特晶体管性能和密度方面将代表一个重大的进步。"

如果这是真的,这意味着英特尔现在已经在生产Meteor Lake的早期版本。我们将不得不等待,看看情况是否如此,但英特尔通常不会对这样的指控作出回应。



Intel famously stalled out at 14nm for many years, allowing AMD to leapfrog it in the process with technology from TSMC. Now it might be experiencing that issue once again trying to make the jump from 10nm to 7nm.
Put another way, Intel is supposed to be launching its first tile-based CPU next year, aka Meteor Lake. This is the company’s first disaggregated CPU, with different tiles built on differing processes. The CPU tile is supposed to be the result of a node jump, going from Intel 7 (10nm) to Intel 4 (7nm). It’s a watershed product for the company as it transitions away from monolithic and hybrid designs to tiles. However, though Meteor Lake has already been delayed many times, it’s now rumored to be cancelled. At least, the desktop parts are believed to be on the chopping block. Therefore, it might still launch at some point, but only for mobile.

The bad news for Chipzilla comes from Twitter user Raichu, a reliable leaker of confidential information, who says Meteor Lake for desktop is “maybe” cancelled because Intel sees it as uncompetitive. Intel had planned on offering only six performance cores, along with 16 efficiency cores. That was laid out in a previous leak of Intel’s plans. As you recall, its current Raptor Lake flagship has eight performance cores, and 16 efficiency cores, so Meteor Lake would be a step backward. It could be true that Intel doesn’t think it’s competitive, and it could also be true it’s delayed once again. It’s not clear the specific reason for the alleged cancellation. However, it is now planning a Raptor Lake refresh in 2023, as we noted previously.

xiandaiyuan 发表于 2023-1-28 14:40

darkblue 发表于 2023-1-28 14:31
如果忘记了之前的历史,以下信息供各位参考:
https://www.extremetech.com/computing/341788-intel-rumore ...

雷丘明明在这里有账号,为啥要转他出口转内销的信息

skke16 发表于 2023-1-28 14:49

风水轮流转,现在轮到AMD挤牙膏了

沙悟净@蓝领 发表于 2023-1-28 16:31

本帖最后由 沙悟净@蓝领 于 2023-1-28 16:45 编辑

之前看过一张Meteor Lake移动版的官方PPT,连接独显仍然是PCIE5.0 X8,

然而现在NA独显都是4.0,接上去就是PCIE4.0 X8,

当独显爆显存的时候,需要通过PCIE读写内存,把一部分内存当作显存用,

这种情况下,Meteor Lake移动版的PCIE4.0 X8的性能损失比AMD龙的PCIE4.0 X16大得多。

panzerlied 发表于 2023-1-28 16:40

沙悟净@蓝领 发表于 2023-1-28 16:31
之前看过一张Meteor Lake移动版的官方PPT,连接独显仍然是PCIE5.0 X8,

然而现在NA独显都是4.0,接上去就 ...

凤凰也是X8

沙悟净@蓝领 发表于 2023-1-28 16:49

本帖最后由 沙悟净@蓝领 于 2023-1-28 17:03 编辑

panzerlied 发表于 2023-1-28 16:40
凤凰也是X8

不会吧,之前看AMD官网凤凰参数PCIE4.0 X16,现在去看只剩下PCIE4.0,

如果上市是X8,我只能买龙了,毕竟2K屏4070移动版爆显存的几率还有点大

darkblue 发表于 2023-1-29 11:05

xiandaiyuan 发表于 2023-1-28 14:40
雷丘明明在这里有账号,为啥要转他出口转内销的信息

账号在哪里,没见到啊
页: [1]
查看完整版本: 英特尔重申Meteor Lake将在今年下半年推出, 明年Lunar Lake投产